MudAndTapeSheets, mud, tape and screws for a room, with the waste counted.

Drywall for a 11 × 16 ft room with 9 ft ceilings, 4 × 8 ft sheets, Level 3

Drywall sheets
17× 4 × 8 ft
468 ft² of wall plus 10% — 11 × 16 ft room, 9 ft high
Wall, boards standing9 ft8 butt joints across this wall17× 4 × 8 ft0.9 buckets mud218 ft tape544 screwsLevel 3
Sheets10% for cuts and breakage174 × 8 ft
Surface area486 ft² wall, less openings468ft²
Joint compound54 lb — Level 3, two coats — for surfaces getting heavy texture0.94.5 gal buckets
Paper tape1 × 250 ft rolls218linear ft
Screws1 lb box544screws
Corner beadoutside corners and ceiling angles27linear ft
Finish leveltwo coats — for surfaces getting heavy textureLevel 3
Sheet sizeeasy to handle, more joints to finish4 × 8 ft
Room length
11 ft
Room width
16 ft
Ceiling height
9 ft
Sheet size
4 × 8 ft
Finish level
Level 3
Ceiling
walls only

What to buy

17 sheets of 4 × 8 ft, 0.9 buckets of joint compound (54 lb), 218 linear ft of paper tape and about 544 screws.

468 ft² of surface — 486 ft² of wall0 — with 10% added for cuts and breakage.

Sheet length changes the job, not just the count

4 × 8 ft boards hung horizontally leave far fewer butt joints than 8 ft boards stood on end. Butt joints are the ones that show, because they have no tapered edge for the tape to sit in — every one has to be feathered wide enough to hide, and that is where the mud and the sanding hours go.

Longer boards are harder to carry and easier to finish. On a 9 ft wall the trade is usually worth it.

Level 3 is a specification, not a preference

Level 3 is two coats and belongs under heavy texture. Level 4 is three coats and is the normal standard for flat or eggshell paint. Level 5 skims the entire surface and costs about 40% more compound plus a great deal more sanding.

If the room has a big window down one side, raking light will show every joint that Level 4 leaves. That is when Level 5 earns its cost, and almost the only time.

Openings are only half deducted here

On purpose. You still cut board around a door and a window, and most of what comes out is offcut that fits nothing. Deducting the full opening area is exactly how people end up two sheets short with the van gone.

Two habits worth having

All-purpose compound for taping, lightweight for the finish coats — lightweight sands far more easily and sanding is where the hours are.

Set the driver clutch so the screw dimples the paper without breaking it. A screw that tears the face paper holds almost nothing, and you cannot see which ones did it once the mud is on.

Notes

  • **Sheet length changes the job more than it changes the sheet count.** 4 × 8 ft boards hung horizontally on an 9 ft wall leave far fewer butt joints than 8 ft boards stood on end — and butt joints are the ones that show, because they have no tapered edge to bury the tape in. Fewer joints means less mud, less sanding and a flatter wall.
  • **Level 3: two coats — for surfaces getting heavy texture.** The finish level is a specification, not a preference — Level 4 under gloss paint or in raking window light will show every joint. Level 5 costs about 40% more mud and a lot more sanding, and it is the right answer for a wall with a big window down one side.
  • Openings are only half deducted here, on purpose. You still have to cut the board around a door and a window, and most of what comes out is offcut. Deducting the full opening area is how people end up two sheets short.
  • Buy the mud in buckets, not boxes, for anything this size — and buy all-purpose for taping and lightweight for the finish coats. Lightweight sands far more easily and that is where the hours go.
  • If a ceiling is going in too, do it before the walls: the wall boards support the ceiling edge, and it saves fighting a sagging board on your own.
  • Screw spacing is 16″ on walls and 12″ on ceilings for a 16″ o.c. frame. Set the driver clutch so the head dimples the paper without breaking it — a screw that tears the face paper holds almost nothing.